High Strength Cold Welding Glue Metal Repair Adhesive Heat Resistance AB Sealant

The glued surface should be polished with sandpaper to keep it clean and oil-free. After mixing thoroughly in the ratio of A:B=1:1, it should be applied to the glued surface. It should be initially positioned at room temperature for 3-6 hours, reaching 70% strength in 20 hours, and reaching 100% strength after 48 hours.

eBay