Thetford Protect All Rubber Roof Treatment w/UV Protection 1 Gallon 68128

If possible, do not treat the roof right before it rains and only apply it in temperatures between 55 and 90 degrees. Step 3: For best results, allow the rubber roof to air dry and cure for at least 24 hours.

eBay