be free from separating and adhesion-reducing substances, e.g. dust, sludge, grease, rubber abrasion, Substrate preparation must be carried out in accordance with DINEN 14879-1:2005, 4.2 ff. to execute. (Larger defects and cracks must be repaired beforehand using suitable products from the SCHOMBURG range.) delivered. The B component is added to the A component. It is important to ensure that the hardener Note: During processing, care must be taken to ensure that the material is evenly distributed by “flooding”. In the case of a two-layer design, after the first layer has hardened, the fresh primer of the second layer is applied with After curing, the unbound quartz sand portion must be carefully removed before a roll/leveling coating, scratch coat or screed is applied. The mixe.
eBay