Centering Pole Leveler Construction Accurate Measurement For Building Survey
Suitable for: building survey. Length: (Approx. ). Belt: (Approx. ). × Vertical Level. If the bubble is on the left, the left side is higher, and if the bubble is on the right, the right side is higher.