Cementitious grouting and anchoring mortar, 1-component and shrinkage-compensated Shrinkage-compensated, crack-free, dimensionally accurate and volume-stable hardening of the mortar. Long processing time, can be processed for up to 45 minutes at + 20 °C. Frost and de-icing salt resistant, high resistance to de-icing agents Non-positive, supporting connection ensures an even load transfer to the foundation. Load-bearing, supporting, force-fitting connection between concrete foundations and machines, steel base plates, steel rails and high-bay supports. Force-fitting casting of prefabricated concrete supports in bucket foundations, drainage channels, steel railings. Void-free connection of built-in parts with unreinforced concrete or reinforced concrete. For grouting heights from 20.
eBay