1Pc MDS100A-1600V Black Three-Phase Diode Bridge Rectifier 100A Amp High Power 1600V 3-Phase
Aliexpress UK
• reset min. Secondary setting: from 0.001mV to 333mV. L W D:21.5 10 3.5CM. Power analysis. III,for distribution systems up to 277/480VAC. Rogwoski coil connect setting. Optional:Rogowski coil sensor.
eBay
ATS 4P 125A 3 phase 4 wire 230V MCB type Dual Power Automatic transfer switch TOMZN TOQ3-4P/125 PV
Aliexpress UK
In excellent condition.
eBay
Zigbee Bi-directional Energy Meter 3 Phase 4 Wire Power Monitor 63A Works with Tuya Zigbee2MQTT Home
Aliexpress UK
Outdoor Weather Station with WiFi Connection & LCD Display. WiFi Weather Underground Connection: Seamlessly connect to Weather Underground and Weathercloud, enabling wireless data transmission. Monitor everything from indoor humidity to outdoor temperatures in style while connected to a global weather network.
eBay
ZS-X14 DC 6-36V 400W BLDC 3-Phase Brushless Motor Driver High-power Controller DC Motor Drive Board
Aliexpress UK
It is commonly used for monitoring power quality, energy usage, and analyzing electrical systems. Fluke 1735 Power Logger - Used, Working Condition. Built-in Reporting Tools: The data can be transferred to a computer for further analysis with Fluke's software.
eBay
DC 12V 30A High-Power Brushless Motor Speed Controller 3-phase Regulator PWM Brushless Motor Speed
Aliexpress UK
Condition is "Used". Very good condition.
eBay
DC 24V-60V 50A 1000W High Power Brushless Motor Controller BLDC Driver For 3-phase Speed Regulator
Aliexpress UK
• Fluke 1736 Power Logger unit. • Supports Fluke Energy Analyze Plus software for detailed reporting. Perfect for electrical engineers, energy auditors, and facility managers. • CAT IV 600V / CAT III 1000V safety rated.
eBay
TOMZN Din Rail 3 phase 2P3P4P 63A 100A 125A 230V Dual Power Automatic Transfer Electrical Selector
Aliexpress UK
Model No: PEL 113. 1 - PEL 113 3-Phase Power and Energy Logger with LCD Screen (2137.54). Three MA193-10-BK MiniFlex Sensors are included. Operation of the PEL 113 is simple and performs single, dual (split-phase), and three-phase power and energy testing.
eBay
TOMZN 3P 3 Phase Din Rail ATS Dual Power Automatic Transfer Switch Electrical Selector Uninterrupted
Aliexpress UK
Energy surveys: Users often ask where measurements should be taken for an energy survey. The answer is multiple points within the facility. Start at the main service feeders; compare the power and energy measured here with the readings from the utility meter to ensure you’re receiving the correct charges. Then move downstream to the larger loads; these should be easy to identify by the current rating of the electrical panels downstream of the service entrances. Measuring at many points will allow a full picture of energy usage across the facility to be developed. The next question users typically have is how long an energy survey should last. This of course depends on the facility, but it is recommended that you measure for a period that matches a typical facility activity period. If the f.
eBay