For external walls, the DPC should be applied 150mm above the adjoining surface and should be linked with the DPM in solid floors. When joining two pieces of DPC, they should be lapped over each other by at least 100mm.
eBay
The DPC can be used in both vertical and horizontal applications to restrict upward and horizontal moving water within structure walls. Bond It DPC is unsuitable for use in applications that places high sheer stress on the DPC, such as restraining walls or high flexible stress, such as freestanding walls and parapets.
eBay
BBA approved. Manufactured embossed to assist mortar adhesion. We will respond as soon as possible.
eBay
eBay
Manufactured by Bond-it. - For internal walls, DPC should be installed at the base of load bearing walls and linked with any adjoining DPM. The DPC should be at least the width the partition it is applied to and lapped by at least 100mm when two DPC's are joined.
eBay
BBA approved. Available lengths are: 5m, 10m, 20m & 30m. Remains flexible even at a low temperatures.
eBay
The DPC can be used in both vertical and horizontal applications to restrict upward and horizontal moving water within structure walls. Bond It DPC is unsuitable for use in applications that places high sheer stress on the DPC, such as restraining walls or high flexible stress, such as freestanding walls and parapets.
eBay
Available lengths are: 5m, 10m, 20m & 30m. Remains flexible even at a low temperatures. We will respond as soon as possible.
eBay