eBay
2K Epoxy Primer Black, 1-Quart 2K Epoxy Primer Sealer/Groundcoat is an exceptional lead and chromate free corrosion-resistant coating with excellent adhesion on a variety of properly prepared surfaces. 2K Epoxy Primer Sealer/Groundcoat improves adhesion of body fillers and resists moisture damage caused by water permeation. If further reduced, this product may be used as a precoat or sealer/groundcoat prior to topcoating. Product Type: Primer/Sealer. Activator/Hardner used: 6144 6164.
eBay
be free from separating and adhesion-reducing substances, e.g. dust, sludge, grease, rubber abrasion, Substrate preparation must be carried out in accordance with DINEN 14879-1:2005, 4.2 ff. to execute. (Larger defects and cracks must be repaired beforehand using suitable products from the SCHOMBURG range.) delivered. The B component is added to the A component. It is important to ensure that the hardener Note: During processing, care must be taken to ensure that the material is evenly distributed by “flooding”. In the case of a two-layer design, after the first layer has hardened, the fresh primer of the second layer is applied with After curing, the unbound quartz sand portion must be carefully removed before a roll/leveling coating, scratch coat or screed is applied. The mixe.
eBay
After the surface has been prepared, clean the relevant surfaces with the cleaning agent ASO-R008 (dilution according to technical specifications). Leaflet from Please note: There must not be a continuous film of water on the surface of the concrete! The substrate must not be dry yet - as it dries, there is a risk that the oil that will rise again will prevent the special primer from adhering to the surface When adding quartz sands, make sure that they are fire-dried and, like other additives, also at a certain temperature After the scattered layer has hardened, the unbound quartz sand is carefully removed before the next work step. After a waiting time of approx. 12 hours to 24 hours can be achieved with an ASODUR coating system or the floor covering structure Pour the mortar.
eBay
After the surface has been prepared, clean the relevant surfaces with the cleaning agent ASO-R008 (dilution according to technical specifications). Leaflet from Please note: There must not be a continuous film of water on the surface of the concrete! The substrate must not be dry yet - as it dries, there is a risk that the oil that will rise again will prevent the special primer from adhering to the surface When adding quartz sands, make sure that they are fire-dried and, like other additives, also at a certain temperature After the scattered layer has hardened, the unbound quartz sand is carefully removed before the next work step. After a waiting time of approx. 12 hours to 24 hours can be achieved with an ASODUR coating system or the floor covering structure Pour the mortar.
eBay
be free from separating and adhesion-reducing substances, e.g. dust, sludge, grease, rubber abrasion, Substrate preparation must be carried out in accordance with DINEN 14879-1:2005, 4.2 ff. to execute. (Larger defects and cracks must be repaired beforehand using suitable products from the SCHOMBURG range.) delivered. The B component is added to the A component. It is important to ensure that the hardener Note: During processing, care must be taken to ensure that the material is evenly distributed by “flooding”. In the case of a two-layer design, after the first layer has hardened, the fresh primer of the second layer is applied with After curing, the unbound quartz sand portion must be carefully removed before a roll/leveling coating, scratch coat or screed is applied. The mixe.
eBay
After the surface has been prepared, clean the relevant surfaces with the cleaning agent ASO-R008 (dilution according to technical specifications). Leaflet from Please note: There must not be a continuous film of water on the surface of the concrete! The substrate must not be dry yet - as it dries, there is a risk that the oil that will rise again will prevent the special primer from adhering to the surface When adding quartz sands, make sure that they are fire-dried and, like other additives, also at a certain temperature After the scattered layer has hardened, the unbound quartz sand is carefully removed before the next work step. After a waiting time of approx. 12 hours to 24 hours can be achieved with an ASODUR coating system or the floor covering structure Pour the mortar.
eBay
As a primer for PCI sealants and PCI coatings on cementitious substrates, mastic asphalt screeds, ceramic coverings, synthetic resin coatings and wooden substrates. As a primer for interior floors before applying floor leveling/filling compounds, also for subsequent parquet bonding on Substrates with adhesive residues from dispersion, reaction resin, water-soluble (e.g. sulphite waste liquor adhesives) and bitumen-containing flooring adhesives. Moisture barrier (two applications required) up to residual moisture = 7 CM-% in the substrate for cement screeds (on underfloor heating up to residual moisture = 5 CM-%) when used as a primer before applying floor leveling compounds with subsequent laying of textile and elastic coverings or parquet. Solvent-free according to TRGS 610, no poll.
eBay