search results

  1. Epoxy Primer Schomburg ASODUR-SG3 10 kg Primer Sealing

    Consumption per mm layer thickness (leveling and scratch filling with quartz sand) approx. 1.6 kg/sqm Surface preparation must be carried out in accordance with din EN 14879-1:2005, 4.2 ff. to carry out. After the scattered layer has hardened, the unbound quartz sand is carefully removed before the next work step. The quartz sand (Ø 0.1-0.6 mm) is added to the previously homogeneously mixed and repotted resin and hardener component Add the quartz sand (Ø 0.06 - 1.5 mm or Ø 0.06 - 3.5 mm) in a coordinated amount (3:25) into the compulsory mixer (e.g. type: Zyklos or UEZ) The mixed screed is applied to the still fresh primer in at least approx. 5 mm layer thickness applied, removed with gauges and Stir the quartz sand (Ø 0.06-1.5 mm) homogeneously into the mixed ASODUR-SG3 in a mix.

    eBay

  2. Borderlands 3 (Xbox One) New 2K Games 5026555361446

  3. Epoxy Primer Schomburg ASODUR-SG3 30 kg Primer Sealing

    Consumption per mm layer thickness (leveling and scratch filling with quartz sand) approx. 1.6 kg/sqm Surface preparation must be carried out in accordance with din EN 14879-1:2005, 4.2 ff. to carry out. After the scattered layer has hardened, the unbound quartz sand is carefully removed before the next work step. The quartz sand (Ø 0.1-0.6 mm) is added to the previously homogeneously mixed and repotted resin and hardener component Add the quartz sand (Ø 0.06 - 1.5 mm or Ø 0.06 - 3.5 mm) in a coordinated amount (3:25) into the compulsory mixer (e.g. type: Zyklos or UEZ) The mixed screed is applied to the still fresh primer in at least approx. 5 mm layer thickness applied, removed with gauges and Stir the quartz sand (Ø 0.06-1.5 mm) homogeneously into the mixed ASODUR-SG3 in a mix.

    eBay

  4. Red Dead Redemption 2 (Ps4) New 2K Games 5026555423045

  5. Schomburg Asodur-Gbm 1 KG Primer Sealer Casting Resin Binding Agent Screed

    be free from separating and adhesion-reducing substances, e.g. dust, sludge, grease, rubber abrasion, Substrate preparation must be carried out in accordance with DINEN 14879-1:2005, 4.2 ff. to execute. (Larger defects and cracks must be repaired beforehand using suitable products from the SCHOMBURG range.) delivered. The B component is added to the A component. It is important to ensure that the hardener Note: During processing, care must be taken to ensure that the material is evenly distributed by “flooding”. In the case of a two-layer design, after the first layer has hardened, the fresh primer of the second layer is applied with After curing, the unbound quartz sand portion must be carefully removed before a roll/leveling coating, scratch coat or screed is applied. The mixe.

    eBay

  6. Tiny Tina's Wonderlands: Next-Level Edition Xbox One & Xbox Series X|S (Eu & Uk) 2K

  7. Mortar Resin Schomburg ASODUR-GBM 3 kg Primer Sealing Agent Binder Mortar

    be free of separating and adhesion-reducing substances, e.g. dust, stillage, grease, rubber abrasion, (Larger defects and cracks must be repaired in advance using suitable products from the SCHOMBURG range.) The material temperature during the mixing process should be approx. +15°C. Do not mix the mixed material process in the delivery container! Pour the mixture into a clean mixing bucket and stir carefully again. Intermediate compaction is absolutely necessary in accordance with the specified material layer thicknesses. In the case of a two-layer design, the fresh primer is added to the second layer after the first layer has hardened After curing, the unbound quartz sand portion must be carefully removed before a rolling/leveling coating, scratch filler or screed is applied. T.

    eBay

  8. Epoxy Resin Rapid Primer Schomburg ASODUR-SG3-Superfast 1 kg Sealing

    Consumption per mm layer thickness (leveling and scratch filling with quartz sand) approx. 1.6kg/m⊃2; dry to moist (according to DAfStB "Guidelines for the protection and maintenance of concrete parts") Surface preparation must be carried out in accordance with din EN 14879-1:2005, 4.2 ff. to carry out. The quartz sand (Ø 0.1-0.6 mm) is added to the previously homogeneously mixed and repotted resin and hardener component Add the quartz sand (Ø 0.06 - 1.5 mm or Ø 0.06 - 3.5 mm) in a coordinated amount (3:25) into the compulsory mixer (e.g. type: Zyklos or UEZ). The mixed screed is applied to the still fresh primer in at least approx. 5 mm layer thickness applied, removed with gauges and Add the quartz sand (Ø 1.0-4.0 mm) in a coordinated amount (1:25) to the compulsory mixer (e.g.

    eBay

  9. Epoxy Resin Rapid Primer Schomburg ASODUR-SG3-Superfast 6 kg Sealing

    Mixing ratio, addition of levelling/scratch filler ASO-FF from 0.02 parts by weight to 0.03 parts by weight Substrate preparation must be carried out in accordance with din EN 14879-1:2005, 4.2 ff. to execute. The quartz sand (Ø 0.1-0.6 mm) is added to the previously homogeneously mixed and repotted resin and hardener components After the sprinkled primer layer has hardened, carefully remove the unbound quartz sand before application. Add the quartz sand (Ø 0.06 - 1.5 mm or Ø 0.06 - 3.5 mm) in the correct amount (3:25) into the compulsory mixer (e.g. type: Zyklos or UEZ) The mixed screed is applied to the still fresh primer in at least approx. 5 mm layer thickness applied, leveled with gauges and Add the quartz sand (Ø 1.0-4.0 mm) in a coordinated amount (1:25) to the compulsory.

    eBay

  10. Mortar Resin Schomburg ASODUR-GBM 1 kg Primer Sealing Agent Binder Mortar

    be free from separating and adhesion-reducing substances, e.g. dust, sludge, grease, rubber abrasion, Substrate preparation must be carried out in accordance with DINEN 14879-1:2005, 4.2 ff. to execute. (Larger defects and cracks must be repaired beforehand using suitable products from the SCHOMBURG range.) delivered. The B component is added to the A component. It is important to ensure that the hardener Note: During processing, care must be taken to ensure that the material is evenly distributed by “flooding”. In the case of a two-layer design, after the first layer has hardened, the fresh primer of the second layer is applied with After curing, the unbound quartz sand portion must be carefully removed before a roll/leveling coating, scratch coat or screed is applied. The mixe.

    eBay

  11. Mortar Resin Schomburg ASODUR-GBM 10kg Primer Sealing Agent Binder Mortar

    For the production of compensation and scratch filler masses, as an underground preparation for coating measures To stir pages and from the ground so that the harder is evenly distributed. It is touched until until Mixing the quartz sand is carried out into the previously homogeneous mixed and repotted resin and Härter component of the binding agent ASODUR-GBM. It is important to ensure that the liquid and firm In the case of compensation/scratch fillings, areas is recommended to add fiber filling material ASO-FEF. The quartz sand is presented in a coordinated quantity in the compulsory mixer (e.g. type: cycle or UEZ). With a two -layer execution, the fresh primer of the second location is included after hardening of the first location After curing, the non-bound quartz sand co.

    eBay

  1. Previous Page (Page 7)Next Page (Page 9)